建設業 PR:Image 2.5 分鏡 → Gemini Omni 成片
ChatGPT 策劃 → Image 2.5 出 3×3 分鏡 → Gemini Omni 一鍵成片/配樂/旁白。B2B 企業宣傳片別從剪輯臺起步——先鎖分鏡再喂視頻模型。
示範影片

提示詞
【① GPT Image 2.5 出 3×3 分镜】 Create one premium photorealistic 3×3 storyboard for a 10-second Japanese construction-company corporate commercial. Brand: “NEXARC CONSTRUCTION” Audience: commercial-property owners, developers, business leaders and engineering recruits. Central message: disciplined design and construction create the places where tomorrow’s work and life begin. LAYOUT One overall landscape 16:9 image. Exactly nine equal 16:9 panels arranged in three columns and three rows. Thin ivory gutters. Small white panel numbers 01–09 in the upper-left corner of each panel. Read left to right, top row to bottom row. No captions, arrows, watermarks or production notes. Only panel numbers and the final brand typography in panel 09. CONTINUITY Recurring lead architect: the same 36-year-old Japanese man, lean build, calm intelligent face, short neatly parted black hair and natural skin texture. He wears a crisp white shirt, dark navy work jacket and charcoal trousers. At the active construction site, add the same white safety helmet, reflective charcoal vest, gloves and safety boots. The recurring development contains one central 18-story rectangular office tower with blue-gray glass, vertical silver fins and a transparent entrance canopy, plus two six-story side buildings, a pedestrian plaza, warm timber accents and young street trees. Keep this building geometry consistent through every construction phase. A thin cobalt-blue line is the visual motif. It appears first on tracing paper and then as a physical survey line at the construction site. It never magically transforms into a building. NINE PANELS 01 — Overhead macro in a dawn architecture studio. The architect draws one precise cobalt-blue line across translucent tracing paper using a ruler and technical pencil. 02 — Low close-up at an empty prepared construction site. A surveyor wearing correct PPE marks one straight cobalt-blue line on the ground. Survey tripod behind. 03 — Wide active foundation stage with excavation, rebar, formwork and concrete pumping. Workers remain in organized safe zones. 04 — Low-angle steel erection. A crane lifts one steel beam into position while properly equipped riggers guide it from safe positions. No worker beneath the load. 05 — Detailed façade installation. Workers using approved lifting equipment and fall protection install one blue-gray glass panel and silver vertical fins. 06 — Elevated wide of the nearly finished development. Crews install pale stone paving, timber benches and young trees around the coherent completed buildings. 07 — Finished office lobby. The same architect, without his helmet but wearing the navy jacket, opens the glass entrance as the first office workers enter. 08 — Grand golden-hour wide of the completed district. Office workers, pedestrians, parked bicycles and a café terrace bring the architecture to life. 09 — Symmetrical blue-hour hero shot of the completed district. Illuminated offices and plaza. Stable centered white text: “NEXARC CONSTRUCTION”. Beneath it: “まだない景色を、つくる。” PHOTOGRAPHY High-end live-action Japanese corporate commercial. Natural full-frame cinema-camera perspective, realistic concrete, structural steel, glass, timber, cables, asphalt and foliage. Cool dawn progressing through clear daylight, golden hour and blue hour. Key light consistently from frame left. Architectural white, graphite, silver, blue-gray glass, warm timber and restrained cobalt blue. Smooth highlight roll-off, moderate depth of field and subtle film grain. SAFETY All construction activity must be physically believable. Correct PPE, fall protection, crane rigging, exclusion zones and stable scaffolding. No workers beneath suspended loads. AVOID Magical construction, object morphing, teleporting materials, instant trees, collapsing structures, demolition, unsafe workers, missing helmets, floating beams, bent cranes, impossible machinery, inconsistent architecture, changing façade colors, duplicate people, malformed hands, CGI-plastic surfaces, miniature-diorama appearance, cartoon styling, futuristic fantasy cities, extra logos, unreadable text or panels other than 01–09. --- 【② Gemini Omni 成片】完整视频 prompt 见原帖回复: https://x.com/husky__create/status/2102337252340994249
中文翻譯
【① GPT Image 2.5 出 3×3 分鏡】 爲一部 10 秒的日本建築公司企業宣傳片創作一張高級照片寫實風格的 3×3 分鏡圖。 品牌:“NEXARC CONSTRUCTION” 受衆:商業地產業主、開發商、企業負責人與工程類應聘者。 核心信息:嚴謹的設計與施工,創造出明日工作與生活啓程的場所。 版面 一張整體橫向 16:9 圖像。恰好九個等大的 16:9 分格,排成三列三行。細象牙色分隔線。每個分格左上角有白色小號分格編號 01–09。從左到右、從上到下閱讀。 無字幕、箭頭、水印或製作說明。只有分格編號,以及第 09 格中最終的品牌文字排版。 連貫性 反覆出現的首席建築師:同一位 36 歲日本男性,體型精瘦,面容沉靜睿智,黑色短髮整齊分縫,自然的皮膚質感。他身穿挺括白襯衫、深藏青色工作夾克和炭灰色長褲。在施工中的現場,再加上同樣的白色安全帽、炭灰色反光背心、手套和安全靴。 反覆出現的開發項目包含一棟中央 18 層矩形辦公塔樓,藍灰色玻璃、豎向銀色裝飾肋與透明入口雨棚,另有兩棟六層側樓、一個步行廣場、暖色木質點綴和年輕的街樹。 在每一個施工階段都保持這套建築幾何形態一致。 一條細鈷藍色線條是視覺母題。它先出現在描圖紙上,隨後成爲施工現場的一條實體測量線。它絕不會神奇地變成一棟建築。 九個分格 01 — 黎明建築工作室中的俯拍微距。建築師用直尺和技術鉛筆在半透明描圖紙上畫下一條精準的鈷藍色線條。 02 — 已準備就緒的空曠施工現場低角度特寫。一名穿戴合規 PPE 的測量員在地面上標出一條筆直的鈷藍色線。身後是測量三腳架。 03 — 寬闊的活躍基礎施工階段,有開挖、鋼筋、模板和混凝土泵送。工人們始終處於有序的安全區域內。 04 — 鋼結構吊裝的低角度。一臺起重機將一根鋼樑吊裝就位,裝備齊整的吊裝工在安全位置引導。吊物下方無工人。 05 — 幕牆安裝細節。工人使用經批準的吊裝設備和防墜落保護,安裝一塊藍灰色玻璃面板和豎向銀色裝飾肋。 06 — 接近完工的開發項目的高位廣角。施工隊在協調一致的建成建築周圍安裝淺色石材鋪裝、木質長椅和幼樹。 07 — 完工的辦公大堂。同一位建築師摘掉安全帽,穿着藏青色夾克,推開玻璃入口,第一批辦公人員走入。 08 — 完工街區的黃金時刻大廣角。辦公人員、行人、停放的自行車和咖啡露臺讓建築有了生命。 09 — 完工街區的藍調時刻對稱主視覺。亮燈的辦公室與廣場。居中穩定的白色文字:“NEXARC CONSTRUCTION”。其下:“まだない景色を、つくる。” 攝影 高端實拍日本企業宣傳片。自然全畫幅電影攝影機視角,真實的混凝土、結構鋼、玻璃、木材、線纜、瀝青與植被。清冷的黎明漸進到晴朗白晝、黃金時刻與藍調時刻。主光始終來自畫面左側。建築白、石墨灰、銀色、藍灰玻璃、暖色木材與剋制的鈷藍色。平滑的高光過渡、適中的景深與細微的膠片顆粒。 安全 所有施工活動必須在物理上可信。正確的 PPE、防墜落保護、起重機吊裝索具、隔離區與穩固的腳手架。吊物下方無工人。 避免 魔法施工、物體變形、材料瞬移、瞬間長成的樹木、結構坍塌、拆除、不安全的工人、缺失安全帽、漂浮的鋼樑、彎曲的起重機、不可能的機械、建築前後不一致、變化的幕牆顏色、重複的人物、畸形的手、CGI 塑料質感表面、微縮模型感、卡通風格、未來奇幻城市、多餘的 logo、不可讀的文字,或 01–09 之外的分格。 --- 【② Gemini Omni 成片】完整視頻 prompt 見原帖回覆: https://x.com/husky__create/status/2102337252340994249
溯源
- 原作者
- husky__create
- 發佈日期
- 2026-09-22
- 原始出處
- 查看原帖 ↗
- 收錄來源
- xianyu110/awesome-gpt-image2.5 · 2102337226311180568 · MIT